Feasibility Study
The study of raw materials
- Research and estimation of resources in terms of qualities and quantities:
- Bibliographic study
- Visits to the various sites
- Definition of additional exploration work
- Estimation of the qualities and quantities of the different resources (lifetime of the deposits)
- 3D geological modeling of deposits
- Definition of the raw mix
The preliminary geotechnical study of the site selected for the establishment of the plant
Market study:
- Cement market of the country of interest
- Consumption history
- Current situation:
- Types of cement
- Geographical segmentation of consumption
- Production – Import – Export
- Tax system
- Economic evaluation:
- Gross domestic product
- Demography
- Major works
- Sales price history
- Current and future capacities
- Current and future market estimation
- Current situation:
- Cement market in the region:
- History and forecast of consumption and capacity
- History and forecast of import and export
- Estimation of export potential
- Conclusion :
- Sales forecast on the local market
- Export sales forecast
The technical study:
- Local conditions
- PLANT location and access
- Climatic and seismic conditions
- Water supply
- Power supply
- Fuel supply
- Environmental protection
- Plant process definitions
- Calculation of raw mix
- PLANT production capacity and expansion possibilities
- Definition of the quality of the manufactured cements
- Study and choice of manufacturing processes
- PLANT master plan
- Mass flow diagrams and storage capacities
- Workshop flowsheets
- Choice of fuels and definition of their characteristics
- Definition of process equipment
- Quarry equipment and machinery
- Primary and secondary crushing
- Storage of raw materials and additives
- Crushing and homogenization of the raw mix
- Cooking: preheater, kiln and cooler
- Main dust removal
- Clinker storage and retake
- Cement grinding and storage
- Bagging, dispatch
- Fuel preparation (coal, oil, gas, alternatives, etc.)
- PLANT utilities (industrial water, compressed air)
- Electricity and Automation
- Definition of power and electrical consumption of the PLANT
- Establishment of diagrams for medium and low voltage electrical principles
- Definition of automation principles
- Definition of the connection between the PLANT and the external electrical network or a power plant on SITE
- Civil engineering
- Location of the PLANT, the quarries and their accesses
- Traffic plan in the PLANT
- Development of the PLANT platform (general earthworks, levelling, fencing, drainage)
- General schedule for carrying out the PROJECT
- Studies
- Manufacturing – Deliveries
- Works – Erection
- Tests and Acceptances
Environmental and social impact assessment (ESA)
- Description of the proposed industrial development
- Background information
- Description of the Existing Environment – the Baseline
- Prediction of impact and evaluation of significant environmental effects
- Mitigation measures
The financial study:
- The PROJECT summary matrix:
- Investment budget
- Production costs (variable costs and fixed costs)
- Selling price
- Financing plan
- The IRR (Internal Rate of Return) and the IRR on equity
- Break-Even Point
- Tables of the various financial states covering the considered operating period of 20 years:
- Cash flow for financial planning (for controlling the synchronization of financial flows)
- Net income statement (net revenue table)
- Forecast balance sheets
- The graph of financial flows
- A sensitivity analysis to assess the variation in the value of the internal rate of return, depending on the various values assigned to the following parameters: total investment, selling price and manufacturing cost
- The interpretation, comments, and recommendations arising from the results obtained from the various simulations